Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/dh_ndki7k/corecommunique.com/wp-includes/functions.php on line 6170

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the basic domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/dh_ndki7k/corecommunique.com/wp-includes/functions.php on line 6170

Deprecated: Function WP_Dependencies->add_data() was called with an argument that is deprecated since version 6.9.0! IE conditional comments are ignored by all supported browsers. in /home/dh_ndki7k/corecommunique.com/wp-includes/functions.php on line 6170
Primetals Technologies replaces LD (BOF) converter for ArcelorMittal Ruhrort in Germany - Core Sector Communique

Primetals Technologies replaces LD (BOF) converter for ArcelorMittal Ruhrort in Germany

Vaicon Link 2.0 maintenance-free converter suspension offers long service life
Newly designed horizontal measuring and sampling system

primetals

Primetals Technologies has won an order from ArcelorMittal Ruhrort GmbH to replace the LD (BOF) converter “K2”. The new turnkey converter with a tapping weight of 150 metric tons will be suspended by a maintenance-free Vaicon Link 2.0. This flexible and rugged suspension system ensures smooth load-bearing and allows for heat-related deformations. A newly developed device for horizontal measuring and sampling from the tilted converter will also be installed in Ruhrort. The new converter is scheduled to come into operation in October 2017.