wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/dh_ndki7k/corecommunique.com/wp-includes/functions.php on line 6170basic domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/dh_ndki7k/corecommunique.com/wp-includes/functions.php on line 6170The post Hot rolling mill from Primetals Technologies produces first coil in Vietnam for Formosa Ha Tinh Steel Co. appeared first on Core Sector Communique.
]]>![]()
| • | Production capacity 5.3 million metric tons of hot strip per annum |
| • | Plant produces many grades of steel, up to API and TRIP grades |
| • | Pair cross technology ensures optimal closed-loop control of profile and flatness |
Primetals Technologies has supplied a hot rolling mill to the new steel works in Vung Ang, Vietnam, which is owned by the Formosa Ha Tinh Steel Corporation (FHS). The first coil was rolled at the end of December 2015. The rolling mill produces a wide range of steel – from quality grades up to API and TRIP grades, and has a capacity of 5.3 million metric tons of hot strip per year. Primetals Technologies was responsible for all the mechanical equipment, and supervised the erection and commissioning. The stands in the finishing mill are equipped with pair cross technology for optimal closed-loop control of the profile and flatness.
The post Hot rolling mill from Primetals Technologies produces first coil in Vietnam for Formosa Ha Tinh Steel Co. appeared first on Core Sector Communique.
]]>The post Rizhao produces the first coil on Arvedi ESP plant from Primetals Technologies appeared first on Core Sector Communique.
]]>| • | First coil rolled within 20 months of receipt of order |
| • | Plant produces hot strip in thicknesses down to 0.8 millimeters |
| • | The production capacity is 2.55 million metric tons per annum |
| • | The Arvedi ESP process reduces energy consumption by up to 45 percent |
The post Rizhao produces the first coil on Arvedi ESP plant from Primetals Technologies appeared first on Core Sector Communique.
]]>